LIFE SMART AgroMobility project seeks to demonstrate the viability of distributed biogas generation as a strategy to reduce the environmental impact of agro-industrial activity.

The expected results include the following points:

• Pig slurry-biodigestion: capacity 150 m3 generating 336 tn CH4/year and, avoiding 730 tn CO2/year in the form of diffuse emissions.
• Biomethane production, upgrading: photobioreactor 1,500 m2, obtaining 80 m3/day of biogas.

• Supply and logistics: high purity biomethane compressed to 250 bar.
• Biomethane as biofuel: two vehicles capable of driving 280,000 km/year.
• Biofertilizer production: from microalgae for N, P, phytohormones and natural fungicides.

LIFE SMART AgroMobility project comprises the following activities:

C1: BASIC AND DETAILED ENGINEERING OF THE PROTOTYPE

Starting with the conceptual engineering and, once the location has been selected, the calculations and administrative permits necessary to build the slurry management and biomethane production prototype are developed.

Progress of the action:

100%
C2: CONSTRUCTION OF THE PROTOTYPE

With the finalisation of activity C1, the activities of site adequacy, installation and connection of the equipment components of the prototype plant of the project will be started.

Progress of the action:

10%
C3: PROTOTYPE START-UP AND OPERATION

Operation of the prototype and demonstration of the technology implementing a circular economy in the agro-industrial sector.

Progress of the action:

0%
C4: BUSINESS PLAN. REPLICABILITY STRATEGY AND TRANSFER OF RESULTS

Validation of the technology from a socio-economic point of view.

Progress of the action:

20%
D1: PROJECT MONITORING

Life Cycle Analysis (LCA).

Progress of the action:

12%
D2: KEY PERFORMANCE INDICATORS (KPIS)

KPIs updating.

Progress of the action:

30%
E1: COMMUNICATION

Dissemination activities of results to the different interest groups: general scope, transfer to industry and scientists.

Progress of the action:

27%
F1: PROJECT MANAGEMENT

Organisation and control of resources to achieve the project objectives.

Progress of the action:

36%